Extension to Form Additional Teaching Space

Hewitt&Carr have carried out a number of small projects at Acton Primary School. We firstly carried out a small extension to the front creating improved administrative facilities and a secure entrance lobby. The second was at the rear of the building where we provided the students with additional breakout and teaching space for the students as well as covered access between the main building and a separate teaching block.

Always to a tight time frame the projects were delivered on time and budget and have provided the school with the much needed accommodation they required.

Local Authority:
Project Size:
Project Value:

Midas Construction (Cheshire) Limited
Cheshire East Council
48 Sqm
Not Disclosed