Hewitt&Carr were commissioned by the successful contractor to work alongside them to deliver these four starter industrial units on a prominent city road site. We carried out the project on a design and build basis, taking the original outline approval and working through RIBA work stages 4-8.
Our aim was to create a building which sat next to a larger industrial unit, utilising the same palette of materials to ensure a holistic design over the whole site.
“
We have worked with HCA over many years, they have a flair for design and can produce drawings at the speed and quality we need them on site. They are always very helpful and are willing to go that extra mile.Contractor – Holland Construction
Goodwins PLC
Ive House Road, Stoke-on-Trent
Stoke-on-Trent City Council
5500 Sqm
Not Disclosed
Ive House Road, Stoke-on-Trent
Stoke-on-Trent City Council
5500 Sqm